Quality Assurance
Balancing of Impeller
- All the Impellers are balance as per ISO 1940-1970(e) and grade 6.3
 
Hydrotesting of pressurised parts (Casing and Backplate) up to 1.5 times the shut-off pressure
 

Fully Computerised Pump Testing System

- Testing is done by fully computerized test bench

- Flow is measured with the help of electro magnetic flow meter

- Suction and discharge pressure are measured with the help of highly sensitive pressure transmitter

- All the energy parameters are measured with help of load manager

- All the instrument are calibrated within a span of 1 year
- Noise and vibration measuring instrument are used while testing of the pumps

 

Copyright © Investa Pumps Pvt. Ltd. All Rights Reserved.